Primary solution — ventilated facades

A ventilated facade as a controlled complete system.

Fascar Group connects the cladding, substructure, ventilation zone, interfaces and installation into one execution route with clear responsibility and approval gates.

System starting point

Cladding alone does not make a functioning facade.

The right solution emerges when every layer, interface and responsibility is reviewed before production.

01

Starting information

Architectural intent, substrate, dimensions, fire and technical requirements, and project timing.

02

Cladding

ACP, HPL, fibre-cement or selected metal cladding according to the approved system and application.

03

Substructure and interfaces

Fixing logic, ventilation zone, openings, corners, plinth, parapet and adjacent works.

04

Controlled execution

Approved basis, revision control, production, installation and visible evidence.

Responsibility boundary

The system must be locked before panel production.

Fascar Group does not automatically accept an unknown substrate, an unapproved design decision or a partner's scope as its own responsibility.

Before pricing

we review the starting information, cladding, dimensions, interfaces and target timing.

Before production

we need approved drawings, material data, tolerance logic and responsibility allocation.

Before installation

we review workfront readiness, dependent works, access and the documentation route.

Materials direction

Material selection must support the system, not replace it.

Products intended for resale will be added to the Materials page only after the manufacturer, technical data, delivery region and commercial terms are confirmed.

Explore the Materials page

Technical Review

Start with the facade condition, not an assumption.

Start a Technical Review